Our Projects:





Project Description
Work included excavation, granular placement, and the installation of new asphalt surfaces. Designated vehicle entry and exit points were created, along with short-term parking areas, all marked with clear signage. New concrete curbs and sidewalks with designated crossing areas were installed to ensure the safety of students during peak times.
To improve overall site drainage, stormwater runoff was directed to a containment pond with flow discharge controls to the City’s storm system. A new perimeter chain-link fence was also installed to enclose the newly constructed area. Despite a delayed start, Morven Construction increased resources and successfully completed the project ahead of schedule during the summer school closure, providing a safer and more efficient drop-off and pick-up zone for the school community.