




Project Description
The Morven team upgraded the storm water system including new sewers, catch basins and maintenance holes. In addition, the majority of asphalt paving and granular base for staff parking and the playground area was replaced.
Students can now enjoy their play area with new engineered wood fiber safety features. The sports field has been completely regraded and restored with natural turf and outdoor seating areas were created with armour stone. Basketball nets and bicycle racks were also installed.
In order to improve safety and traffic flow, the school’s entrance and student drop-off area were completely reconfigured, and a separate entrance was constructed for buses. Keeping a green perspective, Morven constructed timber planting gardens with accessible planting tables and a composting area. Recycling and waste collection has been streamlined with a new Western Red Cedar enclosure on a concrete base.