Our Projects: Emmons & Mitchell – JSM Light Industrial Building

Client:

Emmons & Mitchell – JSM Light Industrial Building

location:

720 Innovation Drive, Kingston

Project Timeline:

19 Months (April 2023 – November 2024)

Project Description

Morven Construction was subcontracted to Emmons & Mitchell Construction on the to complete a light industrial building project in Kingston. The 19-month project, running from April 2023 to November 2024, included the civil work for the development of the site.

Morven’s scope includes the installation of sanitary and storm sewers, which involves concrete manholes, catch basins, pipes, and a stormwater storage chamber system. The service connections to the city sewer mains on Innovation Drive were approximately 5 meters deep, requiring a road closure and localized traffic diversions. Additionally, Morven completed building foundation excavation and backfill, interior upfill, and granular preparation for the concrete slab on grade.

The team also worked on the parking lot and two vehicle entrances, preparing the area for concrete curbs, sidewalks, and a garbage enclosure. Rough grading of the landscape areas, including shaping a swale along the property frontage, was also completed.

After a tenant was secured for the building, Morven was tasked with additional work to facilitate delivery operations. This included creating a specialized truck bay with concrete retaining walls and excavating the rear building exterior to simplify loading and unloading. These changes required further storm pipe and catch basin installations to accommodate the new grading.



Previous Project   Next Project



Morven Construction has proudly served the Southeastern Ontario area for more than three decades. Let us know how we can help.


Connect With Us